
Today (18 June 2026) at 2:11 PM at Government House, Ms. Lalida Periswiwatana, Deputy Spokesperson for the Prime Minister's Office, announced the results of the Cabinet meeting, stating that the Cabinet considered exempting the Department of Rural Roads from compliance with three Cabinet resolutions prohibiting the use of mangrove forest areas. This allows the Department to utilize an area of 8 rai, 2 ngan, and 17.6 square wah of mangrove forest for the Koh Lanta Bridge project, connecting Koh Klang and Koh Lanta Noi subdistricts in Koh Lanta District, Krabi Province, before proceeding with the necessary legal and regulatory permits.
Ms. Lalida further stated that the Koh Lanta Bridge project is a crucial infrastructure project for the South, spanning a total length of 2.527 kilometers. It will connect Koh Klang and Koh Lanta Noi and comprise a cable-stayed bridge, a cantilever bridge, three U-turn points, two viewpoints on the bridge, and connecting roads on both sides. The project aims to alleviate delays caused by ferry travel, mitigate traffic congestion, and improve travel convenience for residents, tourists, and the transportation of goods.
Ms. Lalida further stated that the project received approval in principle from the Cabinet since 2022 and has been allocated a total budget of 1,800 million baht, consisting of 1,260 million baht from foreign loans and 540 million baht from the national budget. Currently, land preparation and various operational aspects have been completed.
Ms. Lalida added that the Environmental Impact Assessment (EIA) found that part of the construction route at the bridge abutment on Koh Lanta Noi cuts through mangrove forest area as per the Cabinet resolution, totaling 8 rai, 2 ngan, and 17.6 square wah, out of the total project area of over 492 rai. Because this area is an incomplete mangrove forest, it is necessary to request an exemption from the Cabinet resolution to allow the project to proceed.
Ms. Lalida further stated that the Ministry of Natural Resources and Environment has no objection to the project, requiring the Department of Rural Roads to strictly adhere to environmental measures, including prevention, mitigation, and monitoring measures for environmental impacts as stipulated in the EIA report. This also includes planting replacement mangrove forests at least 20 times the area used and obtaining all necessary legal permits for land use.
Ms. Lalida concluded that this project will significantly upgrade the transportation system in Krabi province and the Koh Lanta area in the long term, increasing convenience, safety, and speed of travel for the public, reducing transportation limitations, and supporting tourism and the local economy. At the same time, the government continues to prioritize the conservation of natural resources, establishing comprehensive measures for environmental protection, restoration, and compensation, ensuring that infrastructure development and natural resource preservation can proceed sustainably.
Copywriter: Siam Associated Press (SAP) Editorial Department
Pictures: Some illustrations come from the Internet. If there is any infringement, please contact us to delete it.
Source of material: official media /online news
273/3 Ratchadaphisek Rd., Ratchadaphisek, Din Daeng, Bangkok, 10400
Email reporter@sapnewsth.com
Tel. 099 569 5964