Government Spokesperson stated that "Anutin" warns that operational staff and civil servants who "idle" fail to take action on flood relief will be immediately transferred to inactive posts at the Prime Minister's Office.

2026-09-30 17:49 Khanisorn Lorthongdaeng

ปกข่าว เว็บไซต์ (1080 x 1920 px) (3).jpg

Today (30 September 2026), at Naree Samosorn Building, Government House, Mr. Ekkapop Pianpiset, Government Spokesperson, announced updates via the Joint Information Center for Flood Situations (JICC). He stated that rainfall has decreased nationwide, except in the lower South where rain persists, though the water situation remains manageable. A break in rainfall is expected before the next round arrives on October 4–6. In the North and Northeast, seasonal transition rains are occurring; while these may affect the Central region and Bangkok, they are not expected to be prolonged, stationary downpours. Meanwhile, data from the Geo-Informatics and Space Technology Development Agency (GISTDA) indicates that 1.71 million rai of land nationwide has already been affected by flooding.

Mr. Ekkapop added that resources have been mobilized to assist in flooded areas, involving the Department of Disaster Prevention and Mitigation (DDPM), provincial authorities, and various foundations and organizations. Full assistance is being provided. In Bangkok, water levels in various canals have receded, though stagnant floodwaters remain in the eastern areas. Following the Prime Minister's site visit with Bangkok Metropolitan Administration (BMA) officials, pumping operations were intensified through the deployment of additional small, high-capacity pumps (known locally as "Phaya Nak" or "racing pipe" pumps). Today, water levels at the Khlong Chan Flats dropped by 30 centimeters.

Mr. Ekkaphop added that, as operations resumed today, a meeting of the National Disaster Prevention and Mitigation Command chaired by Mr. Anutin Charnvirakul Prime Minister and Minister of Interior, was held to monitor the situation and coordinate aid for flood victims. Discussions were held with the Bangkok Governor regarding the possibility of extending the "work-from-home" period to allow for maximum water drainage. Emphasis was also placed on transport assistance, including increasing public transport services and adding trip frequencies to help residents in flooded areas commute to work.

Regarding the western region, Mr. Ekkaphop noted that on September 29, the Srinagarind and Vajiralongkorn dams in Kanchanaburi Province resumed normal water release operations after a three-day pause. Water will be released at standard levels from today (September 30) through October 4, flowing from Kanchanaburi into the Mae Klong River. This is expected to raise water levels along the riverbanks by 80 centimeters; consequently, residents in these areas are advised to consider evacuating or moving to designated shelters. Coordination with provincial authorities is underway; the provinces of Kanchanaburi, Ratchaburi, and Samut Songkhram have already issued alerts to inform the public. Regarding the eastern region, Prachin Buri Province is currently facing issues, with water levels peaking in Mueang Prachin Buri District; this flow will converge with water from Nakhon Nayok Province—though the water level at Khun Dan Prakan Chon Dam has since receded and is no longer overflowing. Chachoengsao Province is the next area requiring close monitoring over the next 1–2 days, and residents living along the Bang Pakong River should remain particularly vigilant.

Mr. Ekkapop stated that regarding relief efforts, the Ministry of Public Health reported that 52,000 individuals in vulnerable groups have already received care. Affected hospitals include Chaopraya Abhaibhubejhr Hospital, Klaeng Hospital, and Ban Khai Hospital (Rayong Province); while all three are maintaining partial operations, critical ("red-coded") patients from Chaopraya Abhaibhubejhr Hospital are being transferred to nearby facilities today. The national death toll currently stands at 40. The Prime Minister has issued directives to maintain surveillance and warning systems while closely monitoring water conditions in Ratchaburi, Samut Songkhram, Kanchanaburi, and Chachoengsao provinces. The Department of Disaster Prevention and Mitigation (DDPM) has been instructed to ready its equipment, accelerate water drainage from affected areas, and mobilize mobile toilet units from non-flooded local administrative organizations to the flooded zones.

Mr. Ekkapop added that attention must also be paid to the safety and welfare of evacuation centers and the mental health of the public. Provincial governors have been instructed to ensure the quality of donated food and beverages. Furthermore, daily situation reports from all provinces must be submitted to the Office of the Permanent Secretary for Interior and the Government Spokesperson; these reports must be consistent and verified as accurate and factual.

Mr. Ekkapop also addressed the drainage project along the Chai Nat–Pa Sak–Gulf of Thailand route approved by the Cabinet on September 29 which is intended to manage water flow in the area. Phra Nakhon Si Ayutthaya, Ang Thong, Sing Buri, Chai Nat, Lop Buri, and Saraburi provinces will no longer serve as water retention areas. During the Cabinet meeting, the Prime Minister instructed administrative officials and operational staff to cooperate fully. He warned that he would exercise his authority to reassign non-compliant personnel to the Office of the Prime Minister if they failed to cooperate. He expressed confidence that operations would henceforth proceed in a unified manner swiftly and with full mutual cooperation to enable citizens to return to their normal lives.

Mr. Ekkaphop addressed the role of civil servants, noting the involvement of various agencies and sectors such as the Royal Irrigation Department, the Department of Disaster Prevention and Mitigation (DDPM), the Office of the National Water Resources (ONWR), the Hydro-Informatics Institute (HII), and provincial authorities. The Prime Minister emphasized during the Cabinet meeting that if directives issued by ministry executives were not followed by operational staff or if actions taken did not align with executive-level policies he would exercise his authority to transfer the non-compliant individuals to the Office of the Prime Minister for duty.

When reporters asked why today's press briefing could not specify exactly when floodwaters in Bangkok would recede contrary to the September 29 statement predicting a return to normal traffic conditions within 2–3 days Mr. Ekkaphop explained that, overall, water levels are expected to drop by more than 90% within this 2–3 day period. He added that 300–400 small water pumps have been deployed to various communities to accelerate drainage into the Gulf of Thailand. This will reduce the accumulated floodwater within the community; while it is impossible to predict exactly how many days this will take, the work will be carried out as quickly as possible.

When asked whether Bangkok could drain water in time given the forecast of rain from October 4–6 and the influx of northern runoff, Mr. Ekkaphop emphasized that the rain has already passed through Bangkok, and current water levels are being drained. Reports from the Bangkok Governor indicate improved drainage efficiency; water levels in canals that were previously full have receded, allowing flow to resume. Regarding concerns about backflow from the Chao Phraya River, he highlighted that water management in the north is currently under control. Looking at the map, the Ping River flowing from Chiang Mai to Nakhon Sawan shows only a slight increase in volume, while the Nan River remains stable. Furthermore, the flow between the Chao Phraya and Sakae Krang rivers (in Uthai Thani) has stabilized. Consequently, the discharge rate from the Chao Phraya Dam in Chai Nat is currently 2,200 cubic meters per second, with the capacity to increase to 2,500 cubic meters per second.

Mr. Ekkaphop added that a flow rate of 3,000 cubic meters per second would be the critical threshold likely to cause flooding in Bangkok due to backflow. However, current flow rates at the Bang Ban and Bang Sai districts stand at 2,100 cubic meters per second, leaving a margin of 900 cubic meters per second. He also noted that the rain expected between October 4 and 6 is associated with the seasonal transition. As the rainfall is not prolonged, the precipitation is unlikely to significantly impact water levels in the Chao Phraya River.

Mr. Ekkapop added that the Prime Minister has emphasized that government facilities currently affected by flooding such as the Sports Authority of Thailand (SAT) and military compounds should not yet pump out water; instead, priority must be given to draining water from residential areas, with government sites being the last to undergo drainage operations. Regarding the rising water levels in the Mae Klong River driven by a discharge increase of 80% today from dams in Kanchanaburi Province residents living along the riverbanks are urged to monitor local conditions and move their belongings to higher ground.

Copywriter: Siam Associated Press (SAP) Editorial Department
Pictures: Some illustrations come from the Internet. If there is any infringement, please contact us to delete it.
Source of material: official media /online news


Frame 4.png   Frame 5.png   Frame 2.png   Frame 3.png

273/3 Ratchadaphisek Rd., Ratchadaphisek, Din Daeng, Bangkok, 10400

Email reporter@sapnewsth.com‍

Tel. 099 569 5964